| 
		
      
        |  | 
			
				|  |  
				| 
				Scope
            of Services and Experience |  
				|  |  
				| 
				
				INFRASTRUCTURE PLANNING |  
				|  |  
				| Scope of Services Master plans for water and sewer 
				systems are often developed by a variety of municipal, county, 
				state and quasi-public agencies.  PPC normally participates in 
				infrastructure plans as part of a larger, inter-disciplinary 
				project team; in some cases, however, PPC is requested to take 
				the lead role.  The responsibility of PPC in these 
				infrastructure planning projects is to: 
					inventory existing facilities via the application of 
					geographical information system (GIS) software;evaluate regional demographic, economic and land use 
					trends;analyze potential community growth areas;evaluate the location and size of existing and potential 
					service areas;calculate anticipated service demands, e.g., average and 
					maximum day water demands, for facilities and services;evaluate the capacity of existing facilities to support 
					anticipated service demands; and,examine the facility management requirements and 
					organizational structure necessary to carry out future 
					facility operations and maintenance, planning and design, 
					and construction management. ExperiencePPC has completed various regional infrastructure plans as both 
				a prime contractor and subconsultant.  Our experience has 
				involved a wide range of infrastructure plans for public 
				agencies in various Pacific Island nations and U.S. territories, 
				as well as public agencies in the Rocky Mountain region of the 
				United States.  Some examples of our firm’s experience can be 
				reviewed by clicking on the following links to more specific 
				project descriptions. 
 
				
					
						| 
						INFRASTRUCTURE PLANNING |  
						| 
						Project/Location | 
						Client | 
						 Year Completed |  
						| Town of Walden, Colorado Hydraulic Water Study | Walden, CO | 2012 |  
						| Buffalo-Sheridan Area 
							Water System/Lake DeSmet Level 1 Study, Johnson and 
							Sheridan Counties, WY | HKM Engineering | 2007 |  
						| Forecasts of 
							Anticipated Wastewater Flows for Atuu, Leloaloa, and 
							Aua-Anasosopo, Island of Tutuila, American Samoa | American Samoa Power 
							Authority | 2005 |  
						| Koror Pump Stations 
							Evaluation - Koror State, Republic of Palau | American Samoa Power 
							Authority/Republic of Palau | 2004 |  
						| American Samoa 
							Utilities Master Plan and Master Plan Update - 
							American Samoa | American Samoa Power 
							Authority | 2003 and 1995 |  
						| American Samoa Water 
							Facilities Plan; Tutuila, Aunuu, Ofu, Olosega, and 
							Tau Islands, American Samoa | American Samoa Power 
							Authority | 2001 |  
						| Palau Wastewater 
							Facilities Plan; States of Aimeliik, Airai, Angaur, 
							Hatohobei, Kayangel, Koror, Melekeok, Ngaraard, 
							Ngarchelong, Ngardmau, Ngatpang, Ngchesar, 
							Ngeremlengui, Ngiwal, Peleliu, and Sonsorol, 
							Republic of Palau | Parsons Overseas Co./ 
							Republic of Palau | 1994 |  
						| 
						Hawaii 
							Home Prototype Project Infrastructure Assessment - 
							Milolii-Hoopuloa, South Kona, Hawaii | Hawaii County 
							Economic Opportunity Council | 
						1989 |  |  |  |